Cinema Lusso  ×  Officina Acustica

Cinema is architecture.
Performance is a promise.

A private cinema is not a list of equipment. It is a building inside a building, defined by proportion, mass, structure, and the pursuit of silence.

Private cinema design, engineering and installation. United Kingdom, Italy and worldwide.

We begin with architecture because it is the only honest starting point. We engineer the room as the instrument. Everything else is simply a component.

Cinema Buro is a private cinema design and engineering practice, founded in 2025 by Peter Aylett, Ben Goff, Christiaan Beukes and Maurizio Conti. Born from the partnership between Cinema Lusso in the UK and Officina Acustica in Italy, we combine technical leadership with precision manufacturing to design, build and verify reference-grade private cinemas for clients around the world.

Every space is engineered from first principles, then measured and verified against agreed acoustic and visual targets before handover.

This is cinema as architecture: designed with restraint, crafted with care, and proven by measurement.

The engineering is the design, and the design is the engineering. There is no boundary between the two, only rooms of exceptional beauty, emotional impact, and measurable performance.

Our principals have won five CEDIA awards, including the 2022 Global Home Cinema award. Peter Aylett chaired CEDIA RP22, and Christiaan Beukes was its technical author. See our recognition →

What sets the room apart

Four principles behind every build.

We've challenged the status quo of engineering and design. We've written the book on it, and keep delivering the exceptional.

Long section through a Cinema Buro private cinema A room built inside a room: the inner cinema sits on isolation mounts within the host structure, with the screen at the front, stepped seating, a measurement microphone at the reference seat, and the outer envelope enclosing it all. Host structure Inner room Screen Projection Reference seat Isolation mounts iiiiiiiv
Long section. A building inside a building.
  1. i.

    Architecture first

    The room is designed as an instrument before a single component is chosen. Proportion, mass and structure set the ceiling for everything that follows.

  2. ii.

    Engineered silence

    A low noise floor is a design material. We control isolation, resonance and airflow so the only thing you hear is the film.

  3. iii.

    Measurable performance

    Every project is engineered to an agreed level, validated against objective metrics and verified before handover. No guesswork.

  4. iv.

    Absolute discretion

    Our clients value their privacy, and we protect it completely. Most of our work is under NDA. We publish a project only with the client's express permission, and show the rest in person, at Foundry.

How we work

A rigorous process that never wavers.

Designed to CEDIA RP22, from first intentions to final calibration.

No two projects share a timeline. A larger commission typically runs 24 to 36 months, from the first conversation and laying down of intentions, through design, to a finished and verified room. A smaller, more contained project can complete in 3 to 6 months. What never changes is the sequence.

We hold the same discipline whether the engagement lasts a season or several years; every project moves through the same seven stages, in the same order, at whatever pace the brief and the building demand. Nothing is built before it has been modelled, and nothing is signed off before it has been measured.

  1. Discovery

    Find out who will use the room, how, and what they expect from it.

    RIBA 0 / 1Strategic Definition / Briefing

  2. Design

    Define the performance in numbers and shape how it looks. Start with the room itself.

    RIBA 2Concept Design

  3. Engineering

    Make sure it works on paper first. Standards ensure consistency of experience.

    RIBA 3 / 4Spatial Coordination

  4. Specification

    Pick the products that meet the engineering, not the other way round.

    RIBA 3 / 4Technical Design

  5. Installation

    Follow best practice, with minimal guesswork or improvising on site.

    RIBA 5Construction

  6. Calibration

    Not an auto-magic button. It takes expertise, experience and time.

    RIBA 5 / 6Construction / Handover

  7. Verification

    Measure the finished room. Did we deliver what we promised?

    RIBA 6 / 7Handover / Use

Promised objectively at the start. Proven objectively at the end.

Foundry

Where you hear the difference for yourself.

Foundry is our private demonstration studio, and the one place our work can be experienced before a single decision is made. It is a fully engineered reference cinema, built to the same standard we hold every commission to, so you can judge the result with your own eyes and ears rather than a portfolio you're asked to take on trust.

  • 01
    A reference-grade roomReference calibration, engineered isolation, and a controlled noise floor, so you experience the performance target itself, not a showroom approximation.
  • 02
    An honest, unhurried sessionWe walk you through the engineering behind what you're hearing: acoustics, optics, structure and the decisions that shape them. No sales theatre.
  • 03
    By invitation, under discretionVisits are arranged privately, by appointment. Location is shared on confirmation. Everything discussed is treated in confidence, under NDA where you prefer.
Proof without the portfolio

The work stays private. The standard doesn't.

Most of our work is under NDA, and we publish a project only with the client's express permission. Serious clients experience the rest in person, at Foundry.

RP32
We co-chair CEDIA's verification recommended practice
5
CEDIA awards won by our principals
Level 4
RP22's highest performance tier
100%
Performance verified before handover
Recognition

Judged by our peers.

The awards our principals have won, the projects that won them, and the roles we hold at CEDIA, the industry body behind the standards and recommended practices we design to. Projects are named only where the client has given permission.

Awards

  1. 2026
    Finalist Winners announced 28 October 2026

    CEDIA APAC Awards: Best Home Cinema Level IV

    It’s About Time. Cinema Buro. CEDIA

  2. 2022
    Winner

    CEDIA Global Home Cinema Award

    The Expanse. Cinema Lusso, led by Ben Goff. Essential Install

  3. 2022
    Winner

    CEDIA EMEA Awards: Home Cinema Level II

    The Expanse. Cinema Lusso, led by Ben Goff. Essential Install

  4. 2021
    Winner

    CEDIA EMEA Awards: Home Cinema Level I

    Triangles. Cinema Lusso, led by Ben Goff. Home Cinema Choice

  5. 2021
    Winner

    CEDIA EMEA Awards: Best Lighting

    Triangles. Cinema Lusso, led by Ben Goff. Essential Install

  6. 2016
    Winner

    CEDIA EMEA Awards: Best Home Cinema £40k-£100k

    House G&T. Sphere Custom, led by Christiaan Beukes. CEDIA EMEA

Service to the industry

  1. 2023

    CEDIA Standards Volunteer of the Year

    Ben Goff. CEDIA

  2. 2022

    CEDIA Fellow

    Peter Aylett. CEDIA

  3. 2019 to 2020

    CEDIA Global Board of Directors

    Peter Aylett. rAVe

  4. 2017 to 2018

    CEDIA Global Board of Directors, the first combined board

    Christiaan Beukes. HiddenWires

  5. 2015

    CEDIA EMEA Special Recognition

    Peter Aylett. CE Pro

  6. 2014 to 2016

    CEDIA EMEA Board of Directors

    Christiaan Beukes. HiddenWires

  7. 2014

    CEDIA Training Volunteer of the Year

    Peter Aylett. CE Pro

CEDIA/CTA-RP22 Immersive Audio Design Recommended Practice

  • ChairPeter Aylett
  • Technical AuthorChristiaan Beukes
  • ContributorBen Goff
  • ContributorMaurizio Conti

HiddenWires

CEDIA RP32 Audio System Measurement and Verification Recommended Practice

In development

  • Co-ChairBen Goff

"Our clients value their privacy, and so do we. You won't find most of their rooms online. You'll find the same standard we hold every project to, and an open invitation to hear it for yourself."

The Cinema Buro principals
Insights

Thinking, not marketing.

The occasional note on why performance-first cinema is built the way it is.

Request an invite

An invitation
to Foundry.

Our state-of-the-art facilities aren't open to everyone. Tell us about your project. If you're serious about the experience, we'll arrange a private demonstration and discuss what's possible.

Emailhello@cinemaburo.com
StudioFoundry · by appointment only
CoverageUnited Kingdom · Italy · International